ONOMICHI DOCKYARD
InquiryISO 9001
HOME NEWS LINK JAPANESE
Company Information
History
1943年 ONOMICHI DOCKYARD CO., LTD. established
1948年 built No. 1 BUILDING BERTH (5,600 D/W)
1955年 built No. 2 BUILDING BERTH (2,400 D/W)
1957年 built No. 3 BUILDING DOCK (9,000 D/W)
1966年 built No. 5 BUILDING DOCK (9,000 D/W)
Increased the capacity of No. 1 BUILDING BERTH up to 17,000D/W and No. 2 BUILDING BERTH up to 6,500D/W.
Built HULL ASSEMBLY SHOP and STEEL FABRICATION SHOP.
1967年 Enlarged No. 1 QUAY and started building large-sized vessels.
1970年 Built No. 6 REPAIR DOCK (40,000D/W capacity).
Built No. 2 HULL ASSEMBLY SHOP, FITTING SHOP and MAIN OFFICE BUILDING.
1973年 Increased the capacity of No. 1 BUILDING BERTH up to 26,000 D/W and No. 2 BUILDING BERTH up to 85,000 D/W.
Built No. 3 HULL ASSEMBLY SHOP.
1975年 Increased the capital up to 100 million (JPY) and the annual shipbuilding capacity exceeded 360,000D/W.
1976年 Built D/WM 86,300 oil tanker.
1977年 Advanced into the field of shore-based construction industry.
1978年 Licensed to work on steel structures and construction business.
1979年 Licensed to work on construction works of civil engineering and construction industry.
1986年 Built Innoshima works.
1987年 Built the west-side wharf and remodeled No. 1 BUILDING BERTH into the assembly shop.
1988年 Increased the capacity of No. 2 BUILDING BERTH up to 105,000 D/W.
1989年 Introduced a plasma cutting machine.
98,466 D/W Crude Oil Tanker (Aframax) Delivered.
1990年 Remodeled No. 3 REPAIR DOCK into the ASSEMBLY SHOP and increased the capacity of No. 5 REPAIR DOCK up to 53,000 D/W.
Invested in the stocks of SAEKI HEAVY INDUSTRIES CO., LTD., to consolidate the field of ship modification.
1991年 Built the Model Tower Crane (160T) on alongside of the No. 2 BUILDING BERTH in cooperation with FUKUYAMA MACHINERIES CO., LTD. and HITACHI MANUFACTURING INC.
1992年 Invested in the stocks of COLOMBO DRY DOCKS LTD. and Colombo Dockyard Ltd. to consolidate the field of ship repair.
1993年 4,229 TEU Container Carrier (R Type) Delivered.
1994年 Modified the ship launching method to the “Ball Method” launching system and acquired the attestation of ISO9001.
14,543 G/T RORO PassengerShip Delivered.
1995年 47,629 D/W Product Tanker (MR Mark I) Delivered.
1997年 Introduced NC plasma section steel cutting machine.
1998年 Built a sliding roof on the west-side outfitting shop and introduced 3D CAD.
1999年 Renewed the shot blasting shop and introduced the latest shot blasting machine (for wide steel plate).
2000年 Adopted computer network and online systems
2001年 Built the ALL-WEATHER PAINTING SHOP and added NC plasma section steel cutting machine.
2003年 Established the industrial machinery department in Tokyo Branch and built the private electric power generator station.
2004年 Brought in Model Tower Crane (240t) for No. 2 BUILDING BERTH.
46,999 D/W Product Tanker (MR Mark II) Delivered.
2005年 Established the pipe center, enlarged the pipe modularizing unit plant, added a sliding roof, and built a breakwater.
2006年 Enlarged level block and built a sliding roof in east side outfitting shop, water purification plauct and East staff Build.
70,377 D/W Crude Oil Tanker (ICE CLASS) Delivered.
2007年 Energy & Labor Saving RO-RO Cargo Ship "WAKANATSU" won the praise of "Ship of the Year 2006".
Built Matsunaga factory.
2008年 Built Mukaishima factory.
PAGE BACK PAGE TOP